Renewable Energy Feasibility Study
ILLUSTRATIVE SAMPLE REPORT
Illustrative 5 MW solar development · California
A preliminary decision framework for assessing whether a renewable energy opportunity merits further development.
Sample only — not a client project
All project details, figures, and conclusions are hypothetical and provided solely to demonstrate report structure. This is not a completed technical study, engineering certification, financial advice, or an offer of services on specific terms. Do not use it to make an investment or development decision.
5 MW
Illustrative DC capacity
8,250 MWh
Annual generation assumption
$6.0m
Illustrative upfront capital
Executive summary
Conditional proceed to detailed due diligence. The hypothetical site appears suitable for a ground-mounted solar project, but grid availability, environmental constraints, and commercial terms remain unverified.
Resource and site screening
Assume 1,650 kWh per installed kW each year, producing 8,250 MWh in year one. This is an example modeling input—not measured site output. Validate with a bankable resource dataset, a site survey, and a detailed shading and loss assessment.
Economic screening
At an assumed sale price of $70/MWh, year-one gross revenue is $577,500. Illustrative annual operating costs of $120,000 leave $457,500 before financing, taxes, depreciation, degradation, and other adjustments. A $6.0m upfront cost implies a simple, undiscounted payback of about 13.1 years. This is not an IRR or an investment recommendation.
Risks and decision gates
Secure evidence of land control; confirm zoning and environmental requirements; obtain an interconnection estimate; and test downside price, output, and cost scenarios. Any material grid upgrade or permitting barrier could change the conclusion.
Recommended next steps
Commission site-specific energy modeling, preliminary engineering, a grid application, and an investment-grade financial model. Advance only after the project meets the client’s agreed return and risk criteria.
Need an assessment for your project?